You are reporting the following problem report for being abusive, containing personal information, or similar:
Over 50 blocked drains on Towcester Road from the Crematorium through Milton Malsor to railway bridge before Blisworth Reported anonymously at 22:10, Tue 30 July 2019 This road has been in this condition for a couple of months – it is supposed to be regularly inspected. Coming from Milton Malsor there are 6 gullies on this road before the double gulley in the photographs - all of them are blocked. The 3 grips on the opposite side of the road are also completely overgrown. The double gulley was installed following flooding on this road that resulted in a fatality. Both gullies are full of silt.
This road has been in this condition for a couple of months – it is supposed to be regularly inspected. Coming from Milton Malsor there are 6 gullies on this road before the double gulley in the photographs - all of them are blocked. The 3 grips on the opposite side of the road are also completely overgrown. The double gulley was installed following flooding on this road that resulted in a fatality. Both gullies are full of silt.
If you want to report a street problem, return to the homepage and enter your postcode. You can then make a report. We'll send it to your council, and publish it on the site.
If your problem is not a street issue, or is not suitable for publication on the site, then this isn't the right place for it. You should find other contact details on the council’s website.
If you'd like to update a report, please leave an update on the report’s page, underneath the report details.
You can contact technical support on highways@northamptonshire.gov.uk