Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Pothole cluster

Reported anonymously at 20:12, Tue 1 December 2020

When existing the roundabout in a north westerly direction travelling towards Aldi, the point where the two lanes merge back together is littered with a cluster of potholes. In this section of road at least 70% of the top surface is detached leaving both the subbase and base course exposed. Urgent resurfacing is required as previous ‘spot repairs’ have failed and detached.

Topic:

optional

Don't like forms?

You can contact technical support on highways@northamptonshire.gov.uk