Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Signage Headroom Incorrect

Reported by Benjamin P Wright at 08:54, Wed 6 October 2021

Dear Sirs, After reviewing inspection report for the structure it has come to my attention that the headroom signage is incorrect. The inspector has measured the headroom at 3.47m meaning signage show read 3.3m not 3.4m. 3.47 - 0.07 = 3.4 then subtract 0.1 = 3.3m Please can you check and confirm headroom for this structure is correct and amend signage if required. Regards Ben Wright - Assistant Asset Engineer Network Rail

Topic:

optional

Don't like forms?

You can contact technical support on highways@northamptonshire.gov.uk