Closed
Unsafe foot path
Reported in the Slabs - Uneven / Damaged / Cracked category anonymously at 21:09, Fri 8 November 2019
Sent to Northamptonshire Highways 1 minute later. ref: 1838559.
The whole foot path is in a very poor state of repair, uneven, broken up, cracked & concrete edging causing a trip hazard.
Updates
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 21:10, Fri 8 November 2019
-
Thank you for your enquiry. Works have been instructed to repair the footway at two locations on Allan Bank. These works will be undertaken within the next 28 days.
Posted by Northamptonshire Highways at 14:17, Thu 21 November 2019
-
Please have another look at the whole footpath around Allan Bank including the edging where it is missing/sunk/uneven due to the roots from the trees. Also there is a small wall which has bricks missing & that are loose.
Posted anonymously at 16:00, Wed 5 February 2020
-
As part of a system review we have noted that this report has remained open and we have now closed the report to future updates.
If for any reason you believe that the report should not have been closed please raise a new report.
Please provide the old reference number and an explanation as to why you believe the report should not have been closed so we can investigate this further.State changed to: Closed
Posted by Northamptonshire Highways at 16:04, Tue 6 September 2022
This report is now closed to updates from the public. You can make a new report in the same location.