Back to all reports

The bridleway sign was knocked down by Gigaclear

Reported in the Damaged / Missing / Facing Wrong Way category anonymously at 11:10, Sat 1 August 2020

Sent to Northamptonshire Highways less than a minute later. ref: 2225809.

The bridleway sign was knocked down by Gigaclear and has not been replaced.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 11:10, Sat 1 August 2020

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 12:05, Mon 3 August 2020

  • Thank you for your enquiry. This location was inspected on 3rd August 2020. A works order has been raised to install a new bridleway fingerpost within the next 6 months.

    Posted by Northamptonshire Highways at 12:07, Mon 3 August 2020

  • This report has been assessed and a job for repair has been raised.

    Posted by Northamptonshire Highways at 11:50, Mon 28 September 2020

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 15:40, Mon 28 September 2020

This report is now closed to updates. You can make a new report in the same location.