Closed
Defective work carried out to gutter - Water does not flow to drain
Reported in the Potholes / Highway Condition category anonymously at 17:48, Tue 25 August 2020
Sent to Northamptonshire Highways less than a minute later. ref: 2263223.
Previous year the cross-over to the back alley was re-dressed with tarmac. A second pothole repair was carried out to one side of the cross-over at the gutter in the Main Road. That repair is defective, it has bridged and blocks the road gutter so water does not fall within the gutter to the drain in Birchfield Road. The puddle of water that forms in any rainfall is extensive, it spreads over the pavement, and is causing property damage by splashing up adjacent building, and is a risk for freezing a sheet of ice over the pavement in Winter. The defective second repair (at the end of the white line) requires cutting out to allow the water to run within the gutter to the drain.
Updates
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 17:48, Tue 25 August 2020
-
Thank you for your enquiry, a works order has been raised for remedial repairs, to be completed within the next 6 months
State changed to: Action scheduled
Posted by Northamptonshire Highways at 13:59, Tue 8 September 2020
-
Kerb no longer flush with carriageway after some work has been carried out. This is a dropped kerb area.
Posted anonymously at 08:59, Sat 12 September 2020
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 08:59, Sat 12 September 2020
-
Thank you for your enquiry, a works order has been raised for remedial repairs, to be completed within the next 6 months
State changed to: In progress
Posted by Northamptonshire Highways at 17:41, Mon 21 September 2020
-
Crossover needs removing and rekerbing
State changed to: Open
Posted anonymously at 14:07, Tue 22 September 2020
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 14:08, Tue 22 September 2020
-
State changed to: In progress
Updated by Northamptonshire Highways at 17:25, Wed 23 September 2020
-
As part of a system review we have noted that this report has remained open and we have now closed the report to future updates.
If for any reason you believe that the report should not have been closed please raise a new report.
Please provide the old reference number and an explanation as to why you believe the report should not have been closed so we can investigate this further.State changed to: Closed
Posted by Northamptonshire Highways at 16:03, Tue 6 September 2022
This report is now closed to updates from the public. You can make a new report in the same location.