Fixed
Redressing waste of time
Reported via iOS in the Potholes / Highway Condition category anonymously at 19:50, Sat 5 September 2020
Sent to Northamptonshire Highways less than a minute later. ref: 2280174.
The whole of great Billing way is 2 black lines of Black tar as the gravel dressing has not adhere to it. This will be very slippery when the road is wet. Both side need to be totally recovered.
Updates
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 08:49, Mon 7 September 2020
-
Good Afternoon, thank you for your inquiry regarding the surface dressing works that were recently carried out on Great Billing Way. We experienced some issues with the installation of the dressing on site due to a bout of heavy rain which came soon after works were completed. However, the site has now been assessed and will be monitored for the foreseeable future to monitor any changes and to ensure that the carriageway meets the required specifications.
Posted by Northamptonshire Highways at 13:03, Fri 11 September 2020
-
Still open, via questionnaire, 20:19, Sat 3 October 2020
-
I use this piece of road each day and it is one of te worst resurfacing jobs I have seen. I assume the contractor will be be putting it right with no cost to the Borough. I do not know for how many years we have developed tarmacam as a road surface, but to use the rationale of rain following its laying seems ridiculous. I thought I would see the 30 deg plus temperatures being cited as the problem, not a drop of rain. In any case if the contactor was not able to guarantee a good job, they should not have started the job. Pleae confirm my Council Tax or Government grant is not covering the cost of this job. I would also consider changing the contractor for future jobs if they don not repair their shoddy work.
Posted anonymously at 13:01, Mon 5 October 2020
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 13:02, Mon 5 October 2020
-
Still open, via questionnaire, 21:24, Sat 31 October 2020
-
Would there be any update on state of the road. At Great Billing Way There must still be a problem with the road as all signs are still present or is this a way of not taking responsibility of any accidents occur on this road.
State changed to: Investigating
Posted anonymously at 19:54, Mon 9 November 2020
-
Still open, via questionnaire, 22:33, Sat 28 November 2020
-
Good Afternoon, thank you for your enquiry regarding the surface dressing works that took place on Great Billing Way. Remedial works are currently planned to take place in the spring of next year. In the interim, the site will be closely monitored with a temporary speed limit also staying in place to reduce the speed of oncoming traffic. Any safety defects will be addressed as and when they are required.
State changed to: In progress
Posted by Northamptonshire Highways at 12:43, Mon 30 November 2020
-
Still open, via questionnaire, 23:34, Sat 26 December 2020
-
Still open, via questionnaire, 12:31, Sun 24 January 2021
-
Still open, via questionnaire, 13:22, Sun 21 February 2021
-
Still open, via questionnaire, 13:32, Sun 21 March 2021
-
Still open, via questionnaire, 19:03, Sun 18 April 2021
-
Work schedule for may 23rd weather depending
Posted anonymously at 20:18, Sun 16 May 2021
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 20:19, Sun 16 May 2021
-
Work schedule for may 23rd weather depending
Posted anonymously at 20:55, Mon 17 May 2021
Still open, via questionnaire -
Questionnaire filled in by problem reporter
State changed to: Fixed
Posted anonymously at 21:21, Mon 14 June 2021