Drain in from of 24 Glan y More Terrace NN2 8DR blocked

Reported via desktop in the Blocked/Damaged category anonymously at 12:41, Thu 22 October 2020

Sent to Northamptonshire Highways less than a minute later. ref: 2352624.

The drain at 24 Glan Y Mor Terrace is blocked and caused flowing to pathway and into the garage of 1 Liddington Way. This has been reported before but not rectified. NBC has completed gutter cleaning at NCC request but NCC has not cleared the blocked drain. The drain takes 2 days to clear after rain.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 12:42, Thu 22 October 2020

  • State changed to: In progress

    Updated by Northamptonshire Highways at 20:05, Thu 22 October 2020

  • Thank you for your enquiry, a works order has been raised and will be undertaken within the next 28 days.

    Posted by Northamptonshire Highways at 20:05, Thu 22 October 2020

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 20:06, Thu 22 October 2020

  • This drain has still not been cleared, it was advised it would be done within 28 working days ,it is now 30 working days. Due to the drain still blocking the gutter either side of the drain is now filthy and must be a health hazard. It was also reported in August ,the number then was 57860403 ,

    Posted anonymously at 09:43, Thu 3 December 2020

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 09:44, Thu 3 December 2020

  • Thank you for your enquiry, a works order has been raised and will be undertaken within the next 7 days.

    State changed to: In progress

    Posted by Northamptonshire Highways at 10:11, Mon 7 December 2020

  • This drain is still blocked,work has not been carried out as advised, originally the work was due to be carried out within 28working days, this work was not carried out, After contacting fix my street we were then advised that the work would be cleared within 7 working days, the time AGAIN has passed and still no work has been carried out, The drain takes at least 2 days to clear after heavy rain ,the footpath floods and we have water in our garage, the gutter either side of the drain collects rubbish and leaves the path and gutter in a muddy state, This has been in process now since August,and is quite unacceptable .

    Posted anonymously at 19:57, Thu 17 December 2020

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 19:57, Thu 17 December 2020

  • Thank you for your enquiry, a works order has been raised and the works will be undertaken within the next 24 hours.

    State changed to: Closed

    Posted by Northamptonshire Highways at 11:56, Fri 18 December 2020

This report is now closed to updates. You can make a new report in the same location.