Closed
Blocked Drains- causin flooding across the road
Reported via desktop in the Blocked - flooding road/path category anonymously at 12:59, Wed 4 November 2020
Sent to Northamptonshire Highways less than a minute later. ref: 2370773.
Blocked Drains- causin flooding across the road Grettonbrook road-Corby- near the power station- flooding, past power station- right hand side- 2nd left hand bend
Updates
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 13:00, Wed 4 November 2020
-
Just to update your report above which is not accurate to the details i submitted. 1. The flooding is in two areas, the one which you have detailed above is correct. 2. The second area I advised was where Gretton Brook RD meets with Corby Rd near Keepers Lodge Farm, just after the nursery as shown on your map. This floods with water which comes from the area of the Rockingham speedway down onto the Gretton Brook Rd. 3. The other issue I mentioned to your adviser was of large area of road on the entrance to the factory area, shown on your map as No. 108. the road here is in a terrible condition with potholes, cars are going to the right hand side of the road to avoid these, it is dangerous.
Posted anonymously at 09:58, Sun 8 November 2020
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 09:58, Sun 8 November 2020
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 15:55, Mon 9 November 2020
-
State changed to: In progress
Updated by Northamptonshire Highways at 14:12, Thu 12 November 2020
-
Thank you for your enquiry. We have raised a works order to repair the defects and clear the drains that you have reported. These works will be undertaken within the next 28 days.
Posted by Northamptonshire Highways at 14:12, Thu 12 November 2020
-
This report has been assessed and a job for repair has been raised.
State changed to: Action scheduled
Posted by Northamptonshire Highways at 14:14, Thu 12 November 2020
-
Hi, can someone please give me an update as to when the 2 areas of flooding, and one area of potholes will be addressed and repaired, all along Gretton Brook Rd,. This was originally reported on the 4th of November. Here it is the 16th of December and still not fixed? During the frosts last week the road was like an ice rink, very dangerous. The potholes are now extremely dangerous, and very deep.
Posted anonymously at 09:10, Wed 16 December 2020
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 09:11, Wed 16 December 2020
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 10:38, Wed 16 December 2020
-
Hi, since I reported these issues of flooding and serious potholes on the 4th of November, nothing has been done to rectify these issues. A lady seriously damaged her car last week on the potholes, she had to have the car recovered and also the police were involved,since then there have been numerous issues raised with people have damaged there cars in these potholes. WHEN ARE YOU GOING TO FIX THEM??????. Nothing either has been done abut the flooding along Gretton Brook Road, all the points along there which should allow any surface water to drain into the brook, these all appear to be blocked, and now to add to the above, the junction where Gretton Brook Road meets with Corby road, this is also flooded. Please respond to my earlier requests on the 4th of November, and also now to the additional issues, THEY NEED FIXING URGENTLY.
Posted anonymously at 11:32, Mon 28 December 2020
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 11:32, Mon 28 December 2020
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 11:21, Tue 5 January 2021
-
You keep saying you are investigating, or it's under further investigation. Please give a positive update on what is being done to fix these 3 issues. This has being ongoing since I reported them on the 4th of November. Ian Duncan
Posted anonymously at 15:08, Tue 5 January 2021
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 15:09, Tue 5 January 2021
-
Thank you for reporting a fault on the highway, the highways team have now resolved the issue.
State changed to: Fixed
Posted by Northamptonshire Highways at 13:45, Fri 12 March 2021
-
Thank you for your enquiry. We have raised a works order to repair the defects and clear the drains that you have reported. These works will be undertaken within the next 28 days. Update 15.4.21, Thank you for your enquiry. We have raised a works order to repair the defects that you have reported. These works will be undertaken within the next 6 months. On most occasions we are repairing defects of this nature sooner than this target date, however please do not hesitate to contact us should the defects worsen so that our team can carry out a further assessment, attaching a photograph if possible and safe to do so.
State changed to: In progress
Posted by Northamptonshire Highways at 09:59, Thu 15 April 2021
-
As part of a system review we have noted that this report has remained open and we have now closed the report to future updates.
If for any reason you believe that the report should not have been closed please raise a new report.
Please provide the old reference number and an explanation as to why you believe the report should not have been closed so we can investigate this further.
State changed to: Closed
Posted by Northamptonshire Highways at 13:55, Tue 21 March 2023
This report is now closed to updates from the public. You can make a new report in the same location.