Fixed
Raised york stone paving exceeding 20mm trip
Reported via desktop in the Slabs - Uneven / Damaged / Cracked category by Dave Gaster at 07:57, Wed 11 November 2020
Sent to Northamptonshire Highways less than a minute later. ref: 2381594.
The tree root issues alongside the school have recurred, this was previously addressed by removing slabs and inserting asphalt. The asphalt could be removed, with slabs being 'borrowed' from near no 48. The root could have the top edge angle ground down to reduce repeats. This particular choice of yorkstone isn't good, as it is very slippery when wet, most locals walk around it now, texturing should be considered.
Updates
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 07:58, Wed 11 November 2020
-
Thank you for your enquiry a works order has been raised and will be completed within a month
State changed to: In progress
Posted by Northamptonshire Highways at 10:32, Wed 11 November 2020
-
This report has been assessed and a job for repair has been raised.
State changed to: Action scheduled
Posted by Northamptonshire Highways at 10:34, Wed 11 November 2020
-
Thank you for reporting a fault on the highway, the highways team have now resolved the issue.
State changed to: Fixed
Posted by Northamptonshire Highways at 13:40, Tue 1 December 2020
This report is now closed to updates from the public. You can make a new report in the same location.