Back to all reports

Road needed repair

Reported via desktop in the Potholes / Highway Condition category anonymously at 11:07, Wed 16 December 2020

Sent to Northamptonshire Highways less than a minute later. ref: 2434489.

Please see 2195821 works order was placed according to you, if it was done very poor, road is very bumpy and still floods in rain twice over the last week. nowhere for the water to escape to Grips into the field?

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 11:07, Wed 16 December 2020

  • State changed to: In progress

    Updated by Northamptonshire Highways at 09:50, Thu 17 December 2020

  • Thank you for your enquiry. Site has been visited and grip has been cleaned and loose stone has been swept fro the junction. currently the carriageway defects do not meet ncc investigatory levels, however this location will continued to be monitored through highway safety inspections. A works order has been raised and will be completed within 6 months to reset the national speed sign.

    Posted by Northamptonshire Highways at 09:50, Thu 17 December 2020

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 09:50, Thu 17 December 2020

  • When will job repair be done please

    Posted anonymously at 13:54, Wednesday 6 January 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 13:55, Wednesday 6 January 2021

  • Thank you for your enquiry. A works order has already been raised and will be completed within 6 months to repair the damaged national speed limit sign. Our sweeper is on route and will attend today 7.1.21 to sweep the loose stones on the junction.

    State changed to: In progress

    Posted by Northamptonshire Highways at 10:59, Thursday 7 January 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?