© NCC
You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Dangerous Pothole

Reported via desktop in the Damaged Speed Humps category anonymously at 12:50, Fri 29 January 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2509644.

Where the speed hump adjoins the road surface as you drive up Penistone Road towards Mounts Court there is a dangerous pothole that is dangerous, and big enough to damage vehicle wheels or unseat a cyclist/motorcyclist.............

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 12:51, Fri 29 January 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 12:49, Mon 1 February 2021

  • Thank you for your enquiry, a works order has been raised for repairs and will be undertaken within the next 6 months.

    Posted by Northamptonshire Highways at 12:49, Mon 1 February 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 12:50, Mon 1 February 2021

  • Still open, via questionnaire, 13:22, Fri 26 February 2021

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 15:40, Fri 26 March 2021

  • Yes repair done but not to a very high standard, already the repair has sunk due to traffic driving over it, so expect the hole to reappear within a few weeks. Either cheap materials or poor workmanship, but in this town the roads are ALL terrible......overall a disappointing result

    Posted anonymously at 09:57, Sat 27 March 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 09:58, Sat 27 March 2021

  • Thank you for your enquiry, a works order has been raised for repairs and will be undertaken within the next 6 months. Thank you for your enquiry, the defect does not currently meet the investigatory levels for repair and will continue to monitor through highway safety inspections.

    State changed to: In progress

    Posted by Northamptonshire Highways at 12:56, Mon 29 March 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?