Back to all reports

Poor workmanship

Reported via desktop in the Potholes / Highway Condition category anonymously at 09:43, Monday 8 March 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2593897.

Repairs done on this section of road are appalling, to call slipshod workmanship is being kind. An inspector needs to visit the site and view for himself as no photo or description could relay what it is actually like. The location is sudbough rd brigstock from Mauntley ave to the church. This is an has been an ongoing problem over the years where a little patch here and there has only caused greater damage by hydraulic impaction from poorly repaid sections.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 09:43, Monday 8 March 2021

  • Thank you for your enquiry. Temporary repairs have been carried out at this location as to make safe until patching works can be carried out. We have raised a works order for these patching works which will be undertaken within the next 6 months. On most occasions we are repairing defects of this nature sooner than this target date, however please do not hesitate to contact us should the defects worsen so that our team can carry out a further assessment, attaching a photograph if possible and safe to do so.

    State changed to: In progress

    Posted by Northamptonshire Highways at 10:27, Friday 12 March 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?