Back to all reports

Multiple potholes and dangerous road surfaces

Reported via mobile in the Potholes / Highway Condition category anonymously at 05:26, Wednesday 17 March 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2613943.

The condition of Sandy lane is atrocious. There are multiple large potholes and cracks in the road. There’s a huge pothole on one of the corners which is incredibly dangerous and it is impossible to get pictures due to the risks of being hit by a car or lorry. The issues start at the Kisle/harpole roundabout and stretch most of the way up to the harpole/duston double roundabout. This is a ridiculously busy road which needs urgent attention.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 05:26, Wednesday 17 March 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 06:06, Thursday 18 March 2021

  • Thank you for your enquiry. A works order has been raised and will be completed within 6 months to repair the carriageway potholes that meet ncc investigatory levels.

    Posted by Northamptonshire Highways at 06:06, Thursday 18 March 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 06:08, Thursday 18 March 2021

  • I see yellow markings have been placed on the road, which I hope means some repair work is due to take place soon. This road is in urgent need of numerous repairs or even better, complete resurfacing. There are numerous pot holes on both sides of the road, and uneven surfaces with many dips.

    Posted anonymously at 10:37, Wednesday 5 May 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 10:37, Wednesday 5 May 2021

  • Thank you for your enquiry. A works order has been raised and will be completed within 5 months to repair the carriageway potholes that meet ncc investigatory levels.

    State changed to: Closed

    Posted by Northamptonshire Highways at 15:02, Wednesday 5 May 2021

This report is now closed to updates. You can make a new report in the same location.