Large stones and not gravel on pathway

Reported via mobile in the Slabs - Uneven / Damaged / Cracked category anonymously at 17:36, Thursday 8 April 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2660718.

Large stones have been laid by Gas Board when they excavated the area for gas mains work and never replaced the stones with similar instead looks like they have replaced with hardcore and is a trip hazard when walking as you twist your ankles. Unable to push a pushchair or my grandmothers wheelchair along the footpath as it’s so uneven.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 17:37, Thursday 8 April 2021

  • Thanks for your enquiry this will investigated Cadent Gas worked in the road This Area does not look like a foot path The Tarmac footpath ends and sends you across the road and at the other end it dies the same we need to check if this is Hiways or private

    Posted by Northamptonshire Highways at 20:59, Monday 12 April 2021

  • This is what the area use to look like before gas works was carried out on multiple occasions.

    Posted anonymously at 06:25, Tuesday 13 April 2021

  • This is the area that Cadent installed the new gas points in the footpath, they worked for over 2 months in the road and on the footpath, there is no dropped curbs where tarmac ends for wheelchair or pushchairs to be used on the side of the road closed to Laneside Hollow and according to council map it has a footpath down both sides of Windingbrook Lane with grass verges either side.

    Posted anonymously at 06:29, Tuesday 13 April 2021

  • Photos of the new gas points in the verge and not in the road, other picture shows the large stones that have been laid after clearance of the site, no grass verge put back in after the removal of container and equipment, also clearly no actually footpath whether it’s tarmac or stones had been laid.

    Posted anonymously at 13:00, Tuesday 13 April 2021

  • Thanks for your enquiry this has now been passed back to Cadent Gas to clear the loose stones and tidy up

    Posted by Northamptonshire Highways at 17:49, Tuesday 13 April 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?