You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Metal pol fencing

Reported via mobile in the Pedestrian Barriers - Damaged / Missing category anonymously at 09:46, Tue 8 June 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2776304.

White pole fencing with concrete bollards . Poles missing to a shear drop down the bank of the brook into the field . My daughter nearly fell through leaning forward . Just needs replacement poles ie scaffold pole and joiners .

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 09:46, Tue 8 June 2021

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of a White pole fencing, concrete bollards in this area. We are pleased to confirm we have a repair scheduled to resolve this. This should hopefully be completed within 7 days’ time. Please be assured that you will receive an update once repairs are completed.

    State changed to: In progress

    Posted by Northamptonshire Highways at 10:36, Fri 11 June 2021

  • Not fixed

    Posted anonymously at 11:54, Mon 5 July 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 11:55, Mon 5 July 2021

  • Thank you for your further comments. We can confirm that the area has been made safe and materials are on order to resolve the issue for good. This should be with us in the near future. We will then carry out a permanent repair as soon as possible. Thank you for your patience and understanding.

    State changed to: In progress

    Posted by Northamptonshire Highways at 08:41, Thu 8 July 2021

  • How long before youll fix the fencing

    Posted anonymously at 19:23, Thu 22 July 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 19:24, Thu 22 July 2021

  • Nothing been done since reported months ago . Same excuse materials on there way.

    State changed to: Investigating

    Posted anonymously at 15:09, Tue 14 September 2021

  • Nothing been done since reported months ago . Same excuse materials on there way.

    Posted anonymously at 15:47, Tue 14 September 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 14:36, Tue 23 November 2021

  • In progress on 23rd of November its now 24th of December. This job was reported back in June . I work on a building site and even with whats going on in the world . It doesnt take that long to get materials . I wonder if i said i might go to the local paper . It would speed things up.

    Posted anonymously at 09:01, Fri 24 December 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 09:01, Fri 24 December 2021

  • Thank you for contacting Northamptonshire Highways. This query has been forwarded to the Bridge Team, and I can inform you that we had already identified the poor condition of the concrete post and rails through our routine bridge inspections and have a scheme programmed for February 2022 to replace all the post and rails. In addition, the carriageway along this section will be repaired, and we are currently programming this with our surfacing sub-contractor.

    State changed to: In progress

    Posted by Northamptonshire Highways at 17:23, Friday 7 January 2022

  • Lovely that the poles have been fixed a nice job. Just wondering when the road is being resurfaced

    Posted anonymously at 10:08, Monday 21 March 2022

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 10:09, Monday 21 March 2022

  • Update 21/03/2022: Thank you for your enquiry, and we are pleased to note you are happy with the new post and rails. The surfacing was programmed for 17th February when we closed the road. Unfortunately on the day, we were let down by a plant breakdown with the surfacing sub-contractor and so the works had to be aborted. The surfacing works have now been re-programmed for April, with two visits planned. The first is to resurface the road, and the second is to apply the anti-skid treatment. Advance notice boards will be installed to inform motorists of the dates.Thank you for contacting Northamptonshire Highways. This query has been forwarded to the Bridge Team, and I can inform you that we had already identified the poor condition of the concrete post and rails through our routine bridge inspections and have a scheme programmed for February 2022 to replace all the post and rails. In addition, the carriageway along this section will be repaired, and we are currently programming this with our surfacing sub-contractor.

    State changed to: In progress

    Posted by Northamptonshire Highways at 14:35, Monday 21 March 2022

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?