You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Outside Bosworth Independent College

Reported via desktop in the Blocked Ditch category anonymously at 13:24, Mon 21 June 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2807615.

There a several drains that are blocked on the road directly outside the College building which then causes extensive water pooling and subsequent flooding down a steep bank leading to our car park. It also affects the footpath which means pedestrians are forced to cross a very busy and hazardous road.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 13:24, Mon 21 June 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 11:16, Tue 22 June 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 11:18, Tue 22 June 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 11:35, Tue 22 June 2021

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of the drains on St. Georges Avenue. We note with regret, that you feel they are blocked and may pose a flooding risk. We have carried out an assessment of the problem and are pleased to confirm that the problem you have indicated in this location, has a work order to investigate, clean and test the gully. This should hopefully be completed within a months’ time. Please be assured that you will receive an update once repairs are concluded.

    State changed to: In progress

    Posted by Northamptonshire Highways at 11:43, Tue 22 June 2021

  • Please see photos following heavy rain today. The road and footpaths outside are completely flooded due to the blocked drains as well as under our building. Please can this be sorted as a matter of urgency

    Posted anonymously at 18:08, Wed 28 July 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 18:48, Wed 28 July 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 10:15, Thu 29 July 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 10:16, Thu 29 July 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 10:24, Thu 29 July 2021

  • Thank you for your further comments. We can confirm that our drainage team will be out at the location today. Thank you for your continued patience and understanding.

    State changed to: In progress

    Posted by Northamptonshire Highways at 10:43, Thu 29 July 2021

  • Yet again with the rain the road and footpath is totally flooded and water is pouring down in to our car park. Pedestrians cannot pass safely and cars a speeding trough the water and causing a significant hazard.

    This needs dealing with ASAP before a major accident or incident occurs. The front entrance to the college is underwater so those accessing have no other option but to get soaking wet feet going through it.

    Please can you contact me directly to confirm this will dealt with.

    Posted anonymously at 15:47, Fri 30 July 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 15:48, Fri 30 July 2021

  • Thank you for your further comments. Our drainage team attended here on 29th of July and all found all the drains to be working. We can confirm that this matter has also been reported to our Street Cleaning teak for the debris on the carriageway and footway there, as we believe that the leaf debris is responsible for the majority of the blockages here . We can confirm that the reference number is REP 093603.

    State changed to: In progress

    Posted by Northamptonshire Highways at 13:52, Mon 2 August 2021

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 11:10, Wednesday 2 February 2022

This report is now closed to updates. You can make a new report in the same location.