Drain Blocked Outside 329 Wellingborough Road Causing Flooding after Rainfall

Reported via desktop in the Blocked/Damaged category anonymously at 12:36, Wednesday 7 July 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2847165.

This report links with Ref 2800504. The drain is blocked and after rainfall, the water floods the road and leaks into the cellar of 329 Wellingborough Road. This was reported and the work was completed on 18.06.21 but the issue is still there, please can this be re-investigated.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 12:37, Wednesday 7 July 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 12:00, Thursday 8 July 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 12:02, Thursday 8 July 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 13:51, Thursday 8 July 2021

  • k you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of a drain on this section of Wellingborough Road. We note with regret, that you feel it is blocked with mud and causing potential flooding issues. We have carried out an assessment of the problem and are pleased to confirm that the issue you have indicated in this location, has a works order to investigate, clean and test the gully. This should hopefully be completed within a months’ time. Please be assured that you will receive an update once repairs are concluded. With regard to the rainwater channels on the footways, these are the responsibility of the adjacent private landowners to maintain.

    State changed to: In progress

    Posted by Northamptonshire Highways at 14:36, Thursday 8 July 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 15:35, Friday 9 July 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?