You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

2 x Blocked Road Drains

Reported via iOS in the Blocked/Damaged category anonymously at 10:39, Tue 3 August 2021

Sent to Northamptonshire Highways less than a minute later. ref: 2910615.

Following a recent rain shower the two drains remain full of water and must therefore be blocked. The blockage is likely to be further down the road in the pipe run as the drains were cleaned out with a gulley sucker recently. When it rains these drains back up with rainwater then flowing down the road, on the surface, adding to other surface waters from other nearby drains, and heading down Main Street.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 10:40, Tue 3 August 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 14:45, Tue 10 August 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 14:46, Tue 10 August 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 15:07, Tue 10 August 2021

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of the drains in this area of Bridge Road. We note with regret, that you feel they are blocked and flooding the road surface. We are pleased to confirm that the issue you have indicated in this location, has a drainage team that is going to investigate, clean and test the drains. This should be completed within a months’ time. Please be assured that you will receive an update once repairs are concluded.

    State changed to: In progress

    Posted by Northamptonshire Highways at 15:17, Tue 10 August 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 08:15, Wed 11 August 2021

  • Still open, via questionnaire, 18:41, Tue 28 September 2021

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 09:40, Friday 18 March 2022

This report is now closed to updates. You can make a new report in the same location.