Fixed
Poor road condition, multiple potholes and debris
Reported via mobile in the Potholes / Highway Condition category anonymously at 15:24, Tue 3 August 2021
Sent to Northamptonshire Highways less than a minute later. ref: 2911603.
Poor road condition on this junction and down to bottom of Nene View. Cars park alongside path on this junction on lefthand side of nene view as you enter road make it hard to avoid pot holes. Repaired previously but repairs are temporary and do not last long. Poor condition of paths and road generally on this estate which are a trip hazard.
Updates
-
Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.
State changed to: Investigating
Posted by Northamptonshire Highways at 15:25, Tue 3 August 2021
-
State changed to: In progress
Updated by Northamptonshire Highways at 15:38, Mon 9 August 2021
-
Thank you for your enquiry. We have raised a works order to repair the defects that you have reported. These works will be undertaken within the next 6 months. On most occasions we are repairing defects of this nature sooner than this target date, however please do not hesitate to contact us should the defects worsen so that our team can carry out a further assessment, attaching a photograph if possible and safe to do so.
Posted by Northamptonshire Highways at 15:38, Mon 9 August 2021
-
This report has been assessed and a job for repair has been raised.
State changed to: Action scheduled
Posted by Northamptonshire Highways at 15:46, Mon 9 August 2021
-
The road surface at the end of Drayton Close in Islip is in very poor condition. Various small repairs have been made to this area but the problem still remains. The complete surface where vehicles turn is breaking up with large cobblestone stones being torn out of the remaining tarmac Please repair this area
Posted by Alastair Flawn at 13:07, Thu 26 August 2021
-
This report is under further investigation.
State changed to: Under further investigation
Posted by Northamptonshire Highways at 13:08, Thu 26 August 2021
-
Thank you for your enquiry. We have raised a works order to repair the defects that you have reported. These works will be undertaken within the next 6 months. On most occasions we are repairing defects of this nature sooner than this target date, however please do not hesitate to contact us should the defects worsen so that our team can carry out a further assessment, attaching a photograph if possible and safe to do so. Update 3.9.21. Thank you for your enquiry. We have raised a workThanks order to repair the defects that you have reported. These works will be undertaken within the next 5 months. On most occasions we are repairing defects of this nature sooner than this target date, however please do not hesitate to contact us should the defects worsen so that our team can carry out further assessment, attaching a photograph if possible and safe to do so.
State changed to: In progress
Posted by Northamptonshire Highways at 09:35, Fri 3 September 2021
-
Thank you for reporting a fault on the highway, the highways team have now resolved the issue.
State changed to: Fixed
Posted by Northamptonshire Highways at 06:25, Fri 24 December 2021
This report is now closed to updates from the public. You can make a new report in the same location.