You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Blocked Drain in the footpath directly at the back of no. 79 Wake Meadow Court, Northampton, NN3 8NB

Reported via desktop in the Blocked Ditch category anonymously at 11:14, Wed 15 September 2021

Sent to Northamptonshire Highways less than a minute later. ref: 3002532.

Blocked drain in the footpath directly at the back of no. 79 Wake Meadow Court, Northampton, NN3 8NB. Full of soil and rubbish. When it rains this is flooding the path and bringing water into the caller's back garden. Caller would like someone to look into this. If it is not WNC drain - can we advise who they need to contact please.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 11:14, Wed 15 September 2021

  • This is what happens in my garden when is raining.

    Posted anonymously at 14:21, Wed 15 September 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 08:46, Mon 20 September 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 09:55, Mon 20 September 2021

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of the drains on Wade Meadow Cout. We note with regret, that you feel they are blocked and may pose a flooding risk. We have carried out an assessment of the problem and are pleased to confirm that the problem you have indicated in this location, has a work order to investigate, clean and test the gully. This should hopefully be completed within a months’ time. Please be assured that you will receive an update once repairs are concluded.

    State changed to: In progress

    Posted by Northamptonshire Highways at 12:21, Mon 20 September 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 13:43, Mon 20 September 2021

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 10:40, Thu 25 November 2021

This report is now closed to updates. You can make a new report in the same location.