Back to all reports

Pedestrian path to the pedestrian crossing is overgrown

Reported via desktop in the Weeds category anonymously at 16:20, Sunday 19 September 2021

Sent to Northamptonshire Highways less than a minute later. ref: 3011348.

The path alongside the A6 from the public footpath to the pedestrian crossing before the roundabout is covered by bramble and weeds. It is hard to see when leaving the public footpath that there is a way from there to the safety of the light controlled crossing. This means that walkers wishing to go down the footpath at the side of what was the football stadium try to cross the A6 immediately. This is dangerous with the amount of traffic on the A6. The path needs to be cleared so that is obvious there is a safe route to the light controlled crossing.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 16:20, Sunday 19 September 2021

  • Thank you for your enquiry. We are currently delaing with a high volume of queries and will provide a full response to this matter within 10 working days.

    Posted by Northamptonshire Highways at 16:32, Wednesday 22 September 2021

  • Thank you for your further comments. We understand that you have concerns about the condition of footpath in this area; specifically, that you feel it has been obstructed by weeds and brambles. We can confirm a works order has been raised to cut back the overhanging vegetations, in the next 28 days, under our maintenance programme.

    State changed to: No further action

    Posted by Northamptonshire Highways at 13:37, Friday 24 September 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 09:02, Monday 11 October 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 09:04, Monday 11 October 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?