Land-slip from the bank which is on the back of Pheasant Way to the Welford Road

Reported via desktop in the Weeds category anonymously at 13:56, Wed 22 September 2021

Sent to Northamptonshire Highways less than a minute later. ref: 3018140.

The bank which is behind the houses on Pheasant Way to the Welford Road have had a land-slip and is causing concern to the residents of 38 Pheasant Way and neighbours. The land-slip has caused damage to the bank, verges, tree and footpath. The residents would like this to be investigated.

Report also links to Ref: 3015948 There are concerns of the damaged footpath - people are avoiding the path to limit injury but they are walking on the road. Over-growth and weeds were also mentioned.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 13:58, Wed 22 September 2021

  • Thank you for your enquiry. Unfortunately, we are currently experiencing high volumes of enquiries and will endeavour to respond within 10 working days. Thank you for your patience and understanding.

    Posted by Northamptonshire Highways at 16:19, Wed 29 September 2021

  • Thank you for your comment regarding the bank to Welford Road. We recently inspected the slope and footway and the condition does not appear to be deteriorating significantly - however, work is certainly required. The erosion of the soil slope is an ongoing issue and we have looked at a number of options for addressing this whilst ensuring that the stability of the fences at the top of the slope is not compromised. We are currently finalising a design which does not require excavation, with the expectation that this will allow repairs to be implemented this financial year. The trees were removed in February to avoid any issues with working during the nesting season – unfortunately, this has allowed the weeds to grow rapidly. The proposed works to stabilise the slope will include removal of the weeds followed by a replanting scheme on completion which should limit any further weed growth.

    Posted by Northamptonshire Highways at 11:19, Mon 11 October 2021

  • I am more concerned with the whole situation of the fences being perched right on the edge of the precipice. There is no protection on the outside of the fences, what exactly is keeping the fences up?. How can this be safe for residents and road users if there is the possibility of falling from the top? There needs to be a barrier at least 6 ft above the ground level at the top of the bank. This only affects Pheasant Way houses backing onto the main road below. If work is imminent could you please inform me as to what the remedy will be and will it solve the safety aspect if the residents? Thank you

    Posted anonymously at 11:40, Fri 17 December 2021

  • This report is under further investigation.

    State changed to: Under further investigation

    Posted by Northamptonshire Highways at 11:41, Fri 17 December 2021

  • Thank you for your further comments. I believe I have covered these points in our email conversation. Please let me know if there is any further assistance you require.

    State changed to: No further action

    Posted by Northamptonshire Highways at 11:49, Mon 20 December 2021