You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Post holding directions signs have rusted through

Reported via desktop in the Damaged / Missing / Facing Wrong Way category anonymously at 13:30, Fri 22 October 2021

Sent to Northamptonshire Highways less than a minute later. ref: 3078338.

The two posts holding up the sign in question have rusted through to a significant degree. On post has a very large hole at the bottom. Concerns have been raised that if not replaced the sign could fall over on its own or in a high wind be blown into the A43 carriageway.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 13:30, Fri 22 October 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 12:54, Mon 25 October 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 12:56, Mon 25 October 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 12:57, Mon 25 October 2021

  • Thank you for your enquiry. We understand that you have concerns about the condition of the directional signage in this area. We are pleased to confirm that the defects, that meet the specifications for remedial work, have a repair scheduled to resolve them. This should be completed within 6 months’ time. Please be assured that you will receive an update once repairs are concluded.

    State changed to: In progress

    Posted by Northamptonshire Highways at 13:07, Mon 25 October 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 15:16, Mon 25 October 2021

  • Thank you for your enquiry, this has been reported to Highways England. We will update once a reference has been received.

    Posted by Northamptonshire Highways at 09:44, Tue 26 October 2021

  • Following an on-site inspection there is no action required at this time.

    State changed to: No further action

    Posted by Northamptonshire Highways at 14:19, Monday 5 September 2022

This report is now closed to updates. You can make a new report in the same location.