Blocked Drains in underpass

Reported via desktop in the Obstruction (Not Vegetation) category anonymously at 17:56, Wed 10 November 2021

Sent to Northamptonshire Highways less than a minute later. ref: 3116534.

This was reported on 16th Oct 2021 aNo: 3066382 it has been reported as fixed Howver. The drains (4 off) at either end of the underpass at the end of Ladybridge Drive under Mere Way are still blocked blocked clearing the earth away will not stop the bank washing back down. The size of the drain appears to be inadequate and there is no surrounding brickwork to stop the bank collapsing and washing down to block the drains. The problem has not been fixed

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 17:57, Wed 10 November 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 08:49, Thu 11 November 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 08:50, Thu 11 November 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 08:54, Thu 11 November 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 08:55, Thu 11 November 2021

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of the drains in this location. We note with regret, that you feel they are blocked and may pose a flooding risk. We are pleased to confirm that the problem you have indicated in this location, has a work order to investigate, clean and test the gully. This should hopefully be completed within a months’ time. Please be assured that you will receive an update once repairs are concluded. In regards to the size of the drains, they were designed that way and are sufficient for the area in question.

    State changed to: In progress

    Posted by Northamptonshire Highways at 09:10, Thu 11 November 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 14:40, Fri 12 November 2021

  • Still open, via questionnaire, 18:16, Wed 8 December 2021

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?