Back to all reports

Road surface in a bad state of repair, pot holes and rough surface.

Reported via desktop in the Potholes / Highway Condition category anonymously at 10:58, Sat 27 November 2021

Sent to Northamptonshire Highways less than a minute later. ref: 3146478.

This road surface caused my tyre to split and damaged my alloy too. I would like to claim compensation for the damaged caused . Could you arrange for this road surface to be rectified ASAP. I believe this road hasn’t had any work carried out for sometime.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 10:59, Sat 27 November 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 10:05, Wed 1 December 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 10:06, Wed 1 December 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 10:10, Wed 1 December 2021

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of the road in this area; specifically, you feel road surface is in a poor state. We are pleased to confirm that the pathway defects that meet the specifications for remedial work that you have indicated in this location, has a repair scheduled to resolve them. This should hopefully be completed within six months’ time. Please be assured that you will receive an update once repairs are concluded.

    State changed to: In progress

    Posted by Northamptonshire Highways at 10:32, Wed 1 December 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 10:55, Wed 1 December 2021

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 12:35, Thu 16 December 2021

This report is now closed to updates. You can make a new report in the same location.