12 inch pothole near drain cover, 4ft x 6ft dip of 5 inch depth in road, cracking

Reported via desktop in the Potholes / Highway Condition category anonymously at 11:03, Sat 4 December 2021

Sent to Northamptonshire Highways less than a minute later. ref: 3159428.

Between 40 Bush Hill and 54 Bush Hill there are a number of significant problems in the road as photographed. A large 12 inch pothole exists near a drain cover (6 weeks approx.), a 4ft x 6ft dip of 5-6 inches at the centre has formed and cars are swirving to avoid it now. (3 months) There are also long cracks in this area of the road. (3 months).

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 11:03, Sat 4 December 2021

  • State changed to: In progress

    Updated by Northamptonshire Highways at 13:41, Wed 8 December 2021

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 13:42, Wed 8 December 2021

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 14:24, Wed 8 December 2021

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of this section of road; specifically, that you feel there is a pothole present. We are pleased to confirm that the carriageway defects, that meet the specifications for remedial work, have a repair scheduled to resolve them. This should be completed within six months’ time. Please be assured that you will receive an update once repairs are concluded.

    State changed to: In progress

    Posted by Northamptonshire Highways at 14:27, Wed 8 December 2021

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 12:00, Thursday 21 April 2022

This report is now closed to updates. You can make a new report in the same location.