© NCC
You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Gulley's need clearing

Reported via desktop in the Verges - Damaged by Vehicles category anonymously at 09:21, Friday 7 January 2022

Sent to Northamptonshire Highways less than a minute later. ref: 3222104.

Hi, from the point marked on the map, on both sides of the road all the way to the bridge at the bottom of the hill when heading towards Brauston, the gully's are blocked/overgrown meaning the water is running down the roads (causing ice when freezing). 1 car already crashed on Tuesday due to this.

This has been made worse as the have been fibre installation works along the verge's which have lead to further blocked gulleys / change in drainage routes.

Then at the bottom where the bridge is - all drains blocked / gulleys blocked causing flooding across the road during rains until it can flow over the top of the verge...

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 09:21, Friday 7 January 2022

  • This hole is still outstanding and one lower down has been repaired

    There recently an accident in this area with a cyclist who ended up with a broken back

    Posted anonymously at 11:44, Monday 17 January 2022

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?