You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Highway hedge / undergrowth needs radical surgery

Reported via desktop in the Restricted Visibility / Overgrown / Overhanging category by Dave Gaster at 20:44, Friday 14 January 2022

Sent to Northamptonshire Highways less than a minute later. ref: 3241695.

NOTE: YOUR MAP REFUSES TO AIM AT THE BUILDOUT RR / JCC JUNCTION!

The buildout has had one minor cut in the last two years. The pictures show it 100% covered the footways before I cut it back.

The vegetation needs a radical cutback to at least 60cm behind back of path before the end of March 2022.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. We will use the information you have provided to assess and prioritise this fault in accordance with our published response times for fault reports.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 20:44, Friday 14 January 2022

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?