You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Blocked Drain (1)

Reported via desktop in the Blocked/Damaged category anonymously at 21:46, Tuesday 2 August 2022

Sent to Northamptonshire Highways less than a minute later. ref: 3726198.

I asked the team cleaning out the drains in the village of Tiffield if they would clear the two (2) blocked drains just outside the 30 mph limit signs on High Street North. They said because the 2 drains are outsite the 30 mph signs that these are outside his scope because he would require traffic management. Both of these drains have been blocked with silt for approx. three (3) years which I believe make a significant contribution to the flooding we've been experiencing over that period in High Street North.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 21:47, Tuesday 2 August 2022

  • State changed to: In progress

    Updated by Northamptonshire Highways at 11:26, Thursday 4 August 2022

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 11:28, Thursday 4 August 2022

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 11:28, Thursday 4 August 2022

  • This report has been assessed and a job for repair has been raised.

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 11:30, Thursday 4 August 2022

  • Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the drainage on High Street North. We can confirm that we have a work order to investigate, clean and test the gully. This should be completed within six months’ time. Please be assured that you will receive an update once repairs are concluded. We usually find these defects are tended to within 13 weeks.

    State changed to: In progress

    Posted by Northamptonshire Highways at 11:34, Thursday 4 August 2022

  • Thank you for reporting a fault on the highway, the highways team have now resolved the issue.

    State changed to: Fixed

    Posted by Northamptonshire Highways at 14:45, Monday 22 August 2022

This report is now closed to updates. You can make a new report in the same location.