You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Reinstatement works are Shocking!

Reported via desktop in the Slabs - Uneven / Damaged / Cracked category by Rob Reid at 21:20, Sun 7 August 2022

Sent to Northamptonshire Highways less than a minute later. ref: 3737130.

Hanks for your enquiry - This has been passed to BT Openreach andcCity Fibre as they have both worked at this location Both have visited Customer and will fix problems reported to Hiways

State changed to: not the council's responsibility

Northamptonshire Highways Unsubscribe from alerts about this report

Reinstatement is poor and a trip hazard

This is a hazard and not to highways/streetworks specification art standard, if this is not the councils concern then whose is it? I write due to the reply to my last issue was closed as not a concern!

The report's reference number is 3725684. Please quote this if you need to contact the council about this repo

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 21:21, Sun 7 August 2022

  • You have informed me the works have been passed with one contractor carrying out works on Friday. This is a mess! The damage to the 450 year old grade 2 listed building is not in keeping to the property and is indeed the wrong location. the repair to the footpath is some sort of joke and not to street works standards, the block paving repair is not much better and where the plant has been other areas have sunk - this needs removing and replacing fully, there are also diesel spillage on the tarmac - I could go on, I have no faith the works will be rectified as they should. Please clarify the position before I take this further.

    Posted by Rob Reid at 21:25, Sun 7 August 2022

  • Cover has beencreset and whole width of Footway has been relaid City afire are fixing the res5

    State changed to: Closed

    Posted by Northamptonshire Highways at 11:27, Thu 18 August 2022

This report is now closed to updates. You can make a new report in the same location.