Closed
Blocked drain
Reported via desktop in the Blocked/Damaged category by Peter Clayton at 09:11, Wed 17 August 2022
Sent to Northamptonshire Highways less than a minute later. ref: 3760129.
Drain is blocked,causing excessive rain water to be retained on the roadway
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by Northamptonshire Highways at 09:12, Wed 17 August 2022
-
State changed to: In progress
Updated by Northamptonshire Highways at 11:28, Fri 19 August 2022
-
This report has been assessed and a job for repair has been raised.
State changed to: Action scheduled
Posted by Northamptonshire Highways at 11:28, Fri 19 August 2022
-
Thank you for your enquiry. We have raised a works order to repair the defects that you have reported. These works will be undertaken within the next 28 days
State changed to: In progress
Posted by Northamptonshire Highways at 13:06, Fri 19 August 2022
-
This picture was taken at 06:00 05/09/2022. Flood signs are in place
Posted anonymously at 07:23, Mon 5 September 2022
-
Just to confirm my telephone conversation of this morning. The Wellingborough Road,Sywell is at present closed at the point of the reported Drain blockage. (closed 03/10/2022 for 3 days). I was hoping that the drains at this point can be sorted at the same time and hopefully sort a problem. Many Thanks
Posted anonymously at 11:33, Mon 3 October 2022
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing
Posted by Northamptonshire Highways at 09:56, Fri 7 October 2022
-
Investigation: Completed (Defect Found), Defect Repair: Completed (Routine Planned Maintenance)
State changed to: Closed
Posted by Northamptonshire Highways at 10:48, Tuesday 4 July 2023
This report is now closed to updates. You can make a new report in the same location.