You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Cracked slabs which are uneven and dangerous trip hazards.

Reported via mobile in the Slabs - Uneven / Damaged / Cracked category anonymously at 20:46, Tuesday 13 September 2022

Sent to Northamptonshire Highways less than a minute later. ref: 3823522.

Brook Street in Daventry outside wetherspoons (pedestrian pathway directly outside) Walking into town and tripped on one of the cracked slabs which is uneven and dangerous. See photo of the Injury to my toe. I want to claim compensation for this.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 20:46, Tuesday 13 September 2022

  • Investigation: Ongoing (Defect Found), Defect Repair: Not Started

    Posted by Northamptonshire Highways at 12:11, Wednesday 14 September 2022

  • Investigation: Ongoing (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 09:21, Tuesday 20 September 2022

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled - Thank you for your enquiry and for bringing this matter to our attention. We understand that you have concerns about the condition of this section of the footpath adjacent to Brook Street. We are pleased to confirm that the footway defects that meet the specifications for remedial work, have a repair scheduled to resolve them. This should be completed within a month’s time. Please be assured that you will receive an update once repairs are concluded.

    Posted by Northamptonshire Highways at 12:20, Tuesday 20 September 2022

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by Northamptonshire Highways at 10:43, Friday 30 September 2022

  • Investigation: Completed (Defect Found), Defect Repair: Completed (Fixed on site)

    State changed to: Fixed

    Posted by Northamptonshire Highways at 10:21, Monday 3 October 2022

This report is now closed to updates. You can make a new report in the same location.