Fixed
Huge Pothole & Massive Puddle / Flooding
Reported via mobile in the Potholes / Highway Condition category anonymously at 12:35, Thu 15 September 2022
Sent to Northamptonshire Highways less than a minute later. ref: 3827428.
There is a huge pothole by the entrance to the field which is also the access point for a footpath.
As seen in the photos the pothole is so large and deep that when there is heavy rain it causes a massive puddle and flooding and you are forced to walk through it when using the footpath.
The turning can also not be used by vehicles as a passing point due to the severity of the pothole.
The pothole needs repairing and resurfacing and either a drain installing or a way of channelling surface water to the nearby ditch needs to be installed.
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by Northamptonshire Highways at 12:35, Thu 15 September 2022
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry and for bringing this matter to our attention, regarding this section of Banbury Lane. We are pleased to confirm that the carriageway defects that meet the specifications for remedial work, have a repair scheduled to resolve them. This should be completed within six months’ time. Please be assured that you will receive an update once repairs are concluded. We usually find these defects are tended to within 13 weeks. We have also referred the area to the HS2 point of contact at the West Northamptonshire Council to come up with a long term solution to the pooling water.
Posted by Northamptonshire Highways at 09:36, Mon 26 September 2022
-
Investigation: Completed (Defect Found), Defect Repair: Completed (Fixed on site)
State changed to: Fixed
Posted by Northamptonshire Highways at 10:14, Thu 5 January 2023
-
Investigation: Completed (Defect Found), Defect Repair: Cancelled (Fixed on site)
Posted by Northamptonshire Highways at 15:57, Mon 23 October 2023
This report is now closed to updates from the public. You can make a new report in the same location.