Uneven pathways in Allan Bank Wellingborough

Reported via desktop in the Slabs - Uneven / Damaged / Cracked category by Julia Wye at 17:46, Wednesday 21 September 2022

Sent to Northamptonshire Highways less than a minute later. ref: 3839686.

The pathway in Allan Bank is very uneven and in parts breaking up. I am elderly and unsteady I have to walk with a stick or crutches. My partner has Parkinsons and is liable to trip and fall on even ground. I believe this problem has been reported before by other people but nothing has been done. In fact I cannot remember this path ever being resurfaced or repaired. This problem needs to be dealt with before someone trips and has a serious accident

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 17:47, Wednesday 21 September 2022

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry and for bringing this matter to our attention, regarding the footpath adjacent to Allan Bank. We are pleased to confirm that the footway defects that meet the specifications for remedial work, have a repair scheduled to resolve them. This should be completed within a months' time. Please be assured that you will receive an update once repairs are concluded.

    Posted by Northamptonshire Highways at 11:01, Monday 26 September 2022

  • Reference 3839686 I have noted your email regarding the above but the path I am referring to is not adjacent to Allan Bank it is the pathway running around the grass in the middle of Allan Bank Court. The pathway is the path we have to walk down to get to our front doors

    Posted by Julia Wye at 13:56, Monday 26 September 2022

  • Investigation: Completed (Defect Found), Defect Repair: Scheduled

    State changed to: Action scheduled

    Posted by Northamptonshire Highways at 09:55, Friday 14 October 2022

  • Investigation: Completed (Defect Found), Defect Repair: Ongoing

    State changed to: In progress

    Posted by Northamptonshire Highways at 12:17, Monday 17 October 2022

  • Investigation: Completed (Defect Found), Defect Repair: Completed (Work Completed)

    State changed to: Fixed

    Posted by Northamptonshire Highways at 15:26, Monday 17 October 2022

This report is now closed to updates. You can make a new report in the same location.