Lack of drainage on east side of station road pe8 6qb

Reported via desktop in the Blocked - flooding road/path category anonymously at 15:34, Friday 23 September 2022

Sent to Northamptonshire Highways less than a minute later. ref: 3844250.

Email received via CSC

Lack of drainage on east side of station road pe8 6qb, is causing corrosion of stonework and water ingress damage at no 44. because residents park their cars on the west side of the road, all the traffic travels single file on the east side with heavy lorries causing a pooling effect close to the pavement. when it rains a large quantity of water builds in a pool which cascades onto the front of the property causing damage especially combined with salt in the winter months. stonework surrounds to the front door, replaced a year ago are already corroding due to this. the water should flow into the drain but the pooling is below the drain level and is therefore static. n w bainbridge

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 15:35, Friday 23 September 2022

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Thank you for your enquiry and for bringing this matter to our attention, regarding the drainage in this section of Station Road. We are pleased to confirm that the defects that meet the specifications for remedial work, have a repair scheduled to resolve them. This should be completed within six months’ time. Please be assured that you will receive an update once repairs are concluded. We usually find these defects are tended to within 13 weeks.

    Posted by Northamptonshire Highways at 15:21, Monday

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

or No personal details will be stored, and you will not receive updates about this report.

Your update

Tell us about you

Do you have a FixMyStreet password?