Fixed
Blocked drain
Reported via desktop in the Blocked/Damaged category anonymously at 10:45, Wed 30 November 2022
Sent to Northamptonshire Highways less than a minute later. ref: 4004979.
This drain is blocked , with heavy rain it over flows onto the path The gutter ( until I cleared it ,) was inches thick with silt caused by rotting leaves , the water then flows Onto my drive and into my garage. This drain is on the Harborough Road , the major A 508 road opposite a busy B P garage . In a section classed as Glan - Y - Mor terrace . and cars leaving this garage drive through the over flow flooding the path. There is a school for disabled children approx 150 yards from this drain ,and it is dangerous when the drain is over flowing for them to walk on the path, Could you please take action, thank you
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by Northamptonshire Highways at 10:45, Wed 30 November 2022
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - Regarding the condition of the drains in this section of Harborough Road, we are pleased to confirm that the problem you have indicated in this location, has a work order to investigate, clean and test the gully. This should hopefully be completed within a month’s time. Please be assured that you will receive an update once repairs are concluded.
Posted by Northamptonshire Highways at 09:54, Tue 6 December 2022
-
Still open, via questionnaire, 11:07, Wed 28 December 2022
-
This drain is still blocked ,it overflows onto the path and down my drive this was first reported in November 22 Has this been overlooked?
Posted anonymously at 14:18, Sat 7 January 2023
-
3months and still not fixed. Was given a date of 28days.
Posted anonymously at 11:52, Wed 25 January 2023
Still open, via questionnaire -
Investigation: Completed (Defect Found), Defect Repair: Scheduled
State changed to: Action scheduled
Posted by Northamptonshire Highways at 16:55, Wed 25 January 2023
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing
State changed to: In progress
Posted by Northamptonshire Highways at 21:08, Wed 25 January 2023
-
Investigation: Completed (Defect Found), Defect Repair: Completed (Work Completed)
State changed to: Fixed
Posted by Northamptonshire Highways at 21:28, Wed 25 January 2023
This report is now closed to updates from the public. You can make a new report in the same location.