You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

40cm wide,18cm depth &8 meter long pothole coming out on the left hand side of huxloe lodge nn143at towards kettering ro

Reported via mobile in the Potholes / Highway Condition category anonymously at 17:06, Wednesday 25 January 2023

Sent to Northamptonshire Highways less than a minute later. ref: 4170424.

In December, I was driving from kettering to thrapston to work in the morning around 8am where in the location below another car was driving the oposit drirection towards my car and i had to go a little to the side of the road to avoid getting hit where i drove into this pot hole. I herd a loud bang. I stopped the car with the 4 lights and came out and saw that it had at least burst two of the left hand side wheels. I called my breakdown insurance and once they assessed the car condition, he confirmed that both alloys had broken inside the wheel and busted both wheels. The pothole was 40cm wide,18cm depth &8 meter long pothole. The pothole is located coming out on the left hand side of huxloe lodge nn143at towards kettering Road. I have attached receipts of 2 alloy wheels and the tyre cost. I normally commute this way to work. I can't confirm how long the pothole has been there however I can confirm that that road is very damaged with several potholes.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 17:06, Wednesday 25 January 2023

  • Investigation: Completed (Scheduled Maintenance) - We have carried out an assessment and can confirm that a Community Steward has made a semi-permanent repair. A permanent repair will be carried out in the next 28 days and you will receive an update once repairs have been completed.

    State changed to: Closed

    Posted by Northamptonshire Highways at 09:48, Wednesday 1 February 2023

This report is now closed to updates. You can make a new report in the same location.