The drains on the left hand side of the road from Manor Close going up the hill to the church are ALL blocked
Reported via desktop in the Blocked/Damaged category by Kevin Binley at 14:08, Sunday 12 March 2023
Sent to Northamptonshire Highways less than a minute later. ref: 4303948.
All the drains from Manor Close going up Main Street are blocked and completely full with mud. No water can drain into them. This causes all rain water to pour down the entire length of the road from the church till past the Manor Close junction a distance of several hundred yards, causing flooding and dangerous driving conditions.
This can not be removed with a road sweeper. It requires the covers to be lifted and the accumulated mud to be dug out and the underground pipes to be jetted. This was reported in 2021 and nothing has been done
Updates
-
Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.
State changed to: Investigating
Posted by Northamptonshire Highways at 14:08, Sunday 12 March 2023
-
Investigation: Ongoing - Many thanks for raising this report of a possible safety defect. We can confirm that we have arranged for this carriageway to be inspected within seven days.
Posted by Northamptonshire Highways at 14:02, Friday 17 March 2023
-
Investigation: Completed (Defect Found), Defect Repair: Not Started - Regarding the condition of the drains in this section of Lower Street, we are pleased to confirm that the problem you have indicated in this location, has a work order to investigate, clean and test the gully. This should hopefully be completed within a month’s time. Please be assured that you will receive an update once repairs are concluded.
Posted by Northamptonshire Highways at 09:49, Tuesday 2 May 2023
-
Investigation: Completed (Defect Found), Defect Repair: Scheduled
State changed to: Action scheduled
Posted by Northamptonshire Highways at 07:11, Wednesday 17 May 2023
-
Investigation: Completed (Defect Found), Defect Repair: Ongoing
State changed to: In progress
Posted by Northamptonshire Highways at 12:05, Friday 26 May 2023
-
Investigation: Completed (Defect Found), Defect Repair: Completed (Work Completed)
State changed to: Fixed
Posted by Northamptonshire Highways at 07:58, Tuesday
This report is now closed to updates. You can make a new report in the same location.