Verges eroded to create dangerous cliff-edge

Reported via desktop in the Potholes / Highway Condition category anonymously at 19:47, Tuesday 28 March 2023

Sent to Northamptonshire Highways less than a minute later. ref: 4370152.

This is just an example of a problem, and far from the worst, all the way up Park Hill, . Verges on both sides have been deeply eroded to cause a danger to vehicles trying to squeeze past each other on the single track road. The road surface is also scarred and potholed under the railway bridge, and needs a large area of resurfacing, but that has been a long-standing problem, possibly due to inadequate drainage.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for reporting a fault. Officers will now investigate the concerns and this may take up to 5 working days. If you believe that your concerns are urgent then please phone us.

    State changed to: Investigating

    Posted by Northamptonshire Highways at 19:47, Tuesday 28 March 2023

  • Investigation: Completed (Defect Found), Defect Repair: Not Started - Regarding this section of Dingley Road, we can confirm that the carriageway defects that meet the investigatory level for repairs, have work scheduled to resolve them. This should be completed within six months’ time. Please be assured that you will receive an update once repairs are concluded. We usually find these defects are tended to within 13 weeks.

    Posted by Northamptonshire Highways at 13:59, Tuesday 4 April 2023

  • This whole road up/down from Park Hill Farm needs inspection. Under railway bridge since electrification works has been started this is now flooded across full width of road. THIS IS TOTALLY HAZARDOUS …don’t believe ANY INSPECTION has been made by anyone at all. TOTALLY UNIMPRESSED

    Posted anonymously at 15:17, Thursday 27 April 2023

  • THIS PROBLEM REMAINS UNRESOLVED…and will be reported as UNFIXED until it is fixed!!This whole road up/down from Park Hill Farm needs inspection. Under railway bridge since electrification works has been started this is now flooded across full width of road. THIS IS TOTALLY HAZARDOUS …don’t believe ANY INSPECTION has been made by anyone at all. TOTALLY UNIMPRESSED

    Posted anonymously at 15:19, Thursday 27 April 2023

  • Still open, via questionnaire, 12:12, Monday 1 May 2023